This act requires minimum 2hr setup time
* clear, completely flat performance space of 3x3m
* access to standard 240v power to run fountain pump within 20m of performance position
* access to water outlet (eg standard tap or hose) within 40m of performance position
* area to empty fountain after performance (eg sink, drain or garden bed)
The act is also enhanced by having dedicated lighting, and the ambience will be enhanced with background music as it is a silent act.
Performer will require a dressing room 1.5hrs before performance start time, and access to a shower to wash off bodypaint following the performance
If the fountain cannot be bumped out directly after the performance additional fees will apply.
|